For families rebuilding after the region's fires, there's a gap between the certified debris-removal sign-off and the first foundation form: re-grading, pad recertification, over-excavation per the new soils report, and utility trenches. That gap is exactly what we do.
Re-graded rebuild lot with fresh compacted pad, burn-area hillside behind
Rebuild schedules are emotional. We hold committed dates, communicate plainly, and don't pile change orders on people who've already lost enough. Firm written quotes, rock and access spelled out.
Usually not quite. Most jurisdictions require the building pad be recertified — recompacted and tested, or over-excavated and rebuilt with engineered fill — before foundation permits move. Your soils engineer defines the scope; we execute it, typically in days, not weeks.
Yes — rebuild grading is a three-way dance between the geotech's report, the builder's schedule, and the county's inspection steps. We've built our rebuild workflow around exactly that sequence.
Free site visits and same-week estimates across Ventura & Los Angeles counties. Call, text, or send the job details.
Call (805) 217-3863 Request a Free Estimate