Every project below lists what actually matters — dimensions, yards moved, access constraints, and days on site — because that's how you judge a dig crew.
Replace this sample with a real Salas project: photos, specs, and one sentence on what made it interesting.
Specs: Dimensions 20×40 · ~180 cu yd removed · 20 truckloads · standard access · 2 days
Sample — replace with real job
Swap in a real tight-access dig — gate photo, machine-through-gate photo, finished hole.
Specs: 10×16 spa · 5.5-ft side gate · compact excavator · 45 cu yd · 1.5 days
Sample — replace with real job
Swap in a real grading job with the before/after transformation and the compaction story.
Specs: Engineered fill · keyway cut · compaction tested in lifts · certified pad
Sample — replace with real job
Swap in a real removal: the before (old pool), during (breaker), after (flat usable yard).
Specs: Full shell removal · engineered backfill · compaction report · yard reclaimed
Sample — replace with real job
A real rock-dig story builds more trust than ten perfect digs — show the hard one.
Specs: Granite encountered at 3 ft · breaker work · dig completed on revised schedule
Sample — replace with real job
Swap in a real ADU project — this market is growing fast and the photos rank.
Specs: Backyard ADU pad · sewer/water/power trenches · one mobilization
Sample — replace with real job
Want references for a job like yours? Ask — we'll connect you with past clients.
Free site visits and same-week estimates across Ventura & Los Angeles counties. Call, text, or send the job details.
Call (805) 217-3863 Request a Free Estimate